Axis BTA 2100D Manual do Operador Página 56

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 597
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 55
54
Item Description
Start Click Start to execute the desired test
Reset Cancel a test executed with Start.
System Test
Item Description
Run To Completion Click to run all tests without stopping.
Halt On Error Halts the system checks when an error is detected.
Detailed test of the heater zones
Item Description
Trap Tests the Ion Trap heater element May take up to 13.5
hours to complete.
Manifold Tests the Manifold Heater element.
Transfer Line Tests the Transfer Line heater element.
Vista de página 55
1 2 ... 51 52 53 54 55 56 57 58 59 60 61 ... 596 597

Comentários a estes Manuais

Sem comentários