Axis BTA 2100D Manual do Operador Página 92

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 597
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 91
90
The Monitor and Event Message window will detail results of the basic system.
If a fault had occurred, the message would indicate what test failed and the
source of the problem.
A more detailed test of the heater zones can be done by clicking in the box of the
zone to be tested under Heater Test. To complete these tests can take up to
13.5 hours for the trap, 2 hours for the manifold, and three hours for the transfer
line. The manifold and transfer line tests can be run simultaneously.
At the far right of the window is a dialog box of Monitor States, which allows you
to monitor the multiplier, rf, Filament, and Ion Gauge if present. Click the check
box to activate the selection. Some elements of the diagnostic display are active
if some trap components are not on.
Vista de página 91
1 2 ... 87 88 89 90 91 92 93 94 95 96 97 ... 596 597

Comentários a estes Manuais

Sem comentários